Skip to main content
SUPERVISOR
مهدی اشرفی نصرآبادی (استاد مشاور) مهدی بیجاری (استاد راهنما)
 
STUDENT
Sohrab Hashemi nezhad
سهراب هاشمی نژاد

FACULTY - DEPARTMENT

دانشکده مهندسی صنایع
DEGREE
Master of Science (MSc)
YEAR
1387

TITLE

Planning and Scheduling of Orders in cold Rolling Unit at Folad Mobarakeh Complex
Nowadays, the growing complication in the productive industries and need for more efficiency, utilization of production cycle modern technology, more flexibility, better quality of productions, better satisfying of the customer's expectations and lower costs, have been changed the production appearance. In the steel industry that involves with large amount of wealth, labor and energy flow a small improvement in planning has significant consequences such as reducing costs, energy consumption, production time, delivery time and also increasing customer satisfaction. This research aim to present a efficient model in order to schedule the orders in the product line of cold rolled in the "Esfahan's Mobarakeh Steel Company" so that beside the decreasing the inventory level and optimum usage of production line, the costs of delays will be decreased that cause to uplifting of the reputation of the company. In this study, in addition to providing production planning methodologies in different areas of the industry, three models of planning and scheduling orders in cold rolling area with regard to possible output of hot rolling is presented. The first model is a multi-objective planning model which minimizes the costs of delays, inventory keeping and line shutting down. The second model is a linear programming model which has two general cases. This model can be applied in industries like aluminum, copper, textile, carpet weaving, dyeing and generally in each industry that has a multi-stage multi-product production flow. According to certain features of steel industry such as high number of orders, weakness of software in dealing with these orders and other technological constraints, the third model is presented which is a Mixed Integer Linear Programming. In the case that the number of variables is very high and the computer cannot respond in an acceptable time, a heuristic algorithm to improve the initial solution from the third model (without limitation zero and one) is presented The third model is solved by applying real data of Mobarakeh Steel cold rolling in two stages. At first the third model without considering zero-one constraint is solved. In what follows, the zero-one and some other constraints obtained from heuristic algorithm are added to the model and the model is solved by GAMS 23.5.2_win32 software. All the computations are implemented on computer with 32GB RAM and CPU 2.93GHz. The optimal solution, i.e. the required amount of production of each product on each machine per day in three months time horizon is obtained. The output plan demonstrates a remarkable reduction in the volume of delayed orders and also in unused capacity in machineries.
در صنعت فولاد که حجم عظیمی از ثروت، نیروی کار و انرژی در جریان است،کوچکترین بهبود در برنامه ریزی می تواند تأثیرات چشمگیری در کاهش هزینه ها، کاهش مصرف انرژی، کاهش زمان تولید و زمان تحویل و افزایش رضایت مشتریان داشته باشد. در این تحقیق ضمن ارائه متدولوژی های برنامه ریزی تولید در نواحی مختلف این صنعت، سه مدل برنامه ریزی و زمان بندی سفارشات در ناحیه نورد سرد با در نظر گرفتن خروجی امکان پذیر نورد گرم ارائه می شود. مدل اول یک مدل برنامه ریزی چند هدفه است، که هزینه های ناشی از تأخیرات، نگهداری موجودی و توقف خط را کمینه می کند. مدل دوم یک مدل برنامه ریزی خطی می باشد. این دو مدل حالت عمومی داشته و برای صنایعی مانند: آلومینیوم، مس، نساجی، موکت بافی، رنگرزی و هر صنعتی که دارای تولید جریانی بصورت چند مرحله ای چند محصولی باشد، کاربرد دارند. لیکن با توجه به مفروضات خاص صنعت فولاد از جمله: تعداد زیاد سفارشات و ناتوانی نرم افزارهای موجود در برخورد با این تعداد و محدودیت های تکنولوژیکی دیگر، مدل سوم ارائه شده، که یک مدل برنامه ریزی خطی صفر و یک مختلط است. برای شرایطی که حجم متغیرهای مسئله بسیار زیاد است و رایانه قادر به دادن جواب بهینه در زمان قابل قبول نیست، یک الگوریتم ابتکاری جهت بهبود جواب اولیه حاصل شده از مدل سوم (بدون محدودیت‌ صفر و یک) ارائه شده است. داده‌های واقعی ناحیه نورد سرد مجتمع فولاد مبارکه توسط مدل سوم در دو مرحله (بدون محدودیت صفر و یک و با محدودیت صفر و یک در برخی نقاط و اضافه کردن محدودیت های دیگر، برگرفته از ایده الگوریتم ابتکاری) با استفاده از نرم افزار GAMS 23.5.2_win32 توسط رایانه ای با CPU 2.93GHz و 32GB حافظه حل شده و خروجی مورد نیاز یعنی میزان تولید هر محصول روی هر ماشین به تفکیک روز در افق زمانی سه ماهه بدست آمده است. برنامه خروجی، کاهش قابل توجهی را در حجم سفارشات به تأخیر افتاده و ظرفیت استفاده نشده ماشین ها نشان می دهد. کلمات کلیدی: 1- برنامه ریزی تولید 2- زمان بندی سفارشات 3- برنامه ریزی چند هدفه 4- نورد سرد

ارتقاء امنیت وب با وف بومی