Skip to main content
SUPERVISOR
Mahdi Alinaghian
مهدي علينقيان (استاد راهنما)
 
STUDENT
Atefeh Karami nezhad
عاطفه کرمي نژاد

FACULTY - DEPARTMENT

دانشکده مهندسی صنایع
DEGREE
Master of Science (MSc)
YEAR
1395
Waste collection is one of city services that includes high costs and many operational issues. These costs include fixed costs such as vehicle fix cost and variable costs such as personnel costs, fuel cost, etc. Due to high cost and operational activities, improving operations in this area can have a significant impact on cost saving. In this study, a new model for the periodic capacitated arc routing problem with intermediate facilities is presented. In the proposed model, in addition to allowing each link to be visited within a few days of the time horizon, there are several intermediate facilities for evacuating vehicles.
جمع‌آوري زباله ازجمله خدمات شهري است که شامل هزينه‌هاي بالا و مسائل عملياتي فراواني است. اين هزينه‌ها شامل هزينه‌هاي ثابت همچون هزينه وسائط نقليه و هزينه‌هاي متغير همچون هزينه‌هاي پرسنلي، سوخت و غيره مي‌باشد. به دليل هزينه‌هاي زياد و حجم عملياتي بالا، بهبود عمليات در اين حوزه مي‌تواند تأثيرات مناسبي در صرفه‌جويي هزينه داشته باشد. در اين پژوهش، مدل جديدي براي مسئله مسيريابي کمان ظرفيت­دار دوره‌اي با وجود تسهيلات مياني ارائه مي‌شود. در مدل پيشنهادي علاوه ­بر اينکه امکان بازديد هر اتصال در چند روز از افق زماني وجود دارد، چندين تسهيل مياني نيز براي تخليه وسائط نقليه وجود دارد. در هر دوره از ميان مکان‌هاي بالقوه براي استقرار تسهيلات مياني، تعداد از پيش تعيين شده­اي انتخاب مي‌شوند

ارتقاء امنیت وب با وف بومی